A national cultural landmark needed a music room finished to performance acoustics, on an immovable cultural-calendar deadline. Off-the-shelf furniture could not meet the spec, the finish, or the timeline.
We engineered bespoke acoustic joinery and seating in-house, prototyped for sign-off, then produced and finished the full room at our Obour City facility, controlling quality at every stage before installation.
Delivered and installed ahead of the opening, the music room has performed in daily cultural use since 2023, made to the standard a national stage demands, and made to stay.